Provide comprehensive geotechnical engineering services including survey, design, construction, and monitoring
2020
The company was founded in 2020
Holds over ten patents and provincial-level construction methods, with dewatering and dynamic compaction construction energy levels exceeding 50000kN·m
10000000㎡
Total construction area exceeds 10 million square meters
On the wings of innovation, we build the foundations of infrastructure.
Total construction area exceeding 10 million m².
50+
The company currently partners with central SOEs and overseas enterprises.
Currently partnering with 50+ central SOEs and overseas enterprises.
50000kN·m
Can undertake compaction energy up to 50000kN·m
Capable of undertaking compaction energy up to 50,000 kN·m.
Self-developed technology
Focus on precipitation dynamic compaction and vacuum preloading
SINCE 2020
Pile foundation engineering, sludge and silt solidification, impact compaction, equipment rental
About HUBEIJUNHUI
About Hubei Junhui Geotechnical
Hubei Junhui Geotechnical Engineering Co., Ltd. was established on June 3, 2020. Although Junhui Geotechnical is young, it has already demonstrated vigorous vitality and dynamism. The company integrates survey, design, and construction, focusing on foundation treatment business. Its footprint spans across China, and it actively explores overseas markets, leaving a significant mark in fields such as ports, airports, energy, highways, railways, wind power, municipal engineering, national defense engineering, and land reclamation.
The company's independently developed series of foundation treatment technologies, including the "Deep Rapid Dewatering Dynamic Consolidation Method (Dewatering Dynamic Compaction)" and the "Rapid Consolidation Sand-Free Direct Drainage Vacuum Preloading Method," are like sharp swords targeting the pain points of traditional processes, demonstrating significant advantages in the treatment of complex foundations such as sand, silt, clayey silt, soft clay, mud, and sludge.
Compared with traditional processes, the "Deep Rapid Dewatering Dynamic Consolidation Method" shortens the construction period by one-third, achieves greater treatment depth, lower cost, higher bearing capacity, lower water content, and smaller post-construction settlement, perfectly meeting the stringent requirements of heavy-load workshops in railways, ports, and local heavy industry enterprises. The "Rapid Consolidation Sand-Free Direct Drainage Vacuum Preloading Method": compared with the traditional vacuum preloading method, it offers lower cost, shorter construction time, higher intelligence, and requires no solid additives, truly achieving green and environmentally friendly construction.
To date, Junhui Geotechnical has owned more than ten invention patents and multiple utility model patents, and has received recognition for two provincial-level construction methods in Hubei Province. Behind these honors lies the firm commitment of Junhui people to the philosophy that "Innovation determines the future, and craftsmanship creates brilliance."
View Details
High Precision
High Energy Level
High Energy Level
High Quality
High Quality
High Precision
Wide coverage of compaction energy levels, capable of undertaking high-energy dynamic compaction
Supported by over ten patents and provincial-level construction methods, project quality is guaranteed
Precise control of dewatering and dynamic compaction parameters ensures reliable foundation treatment quality
Partner Companies
Partner Companies
+
50
Partner companies at home and abroad
Learn more
Leave your information and we will get in touch with you.
Leave your information and we will contact you.
Contact Us
Contact Us